Penalties and Bonuses – How To Avoid Project Delays and Incentivize Timely Completion.
Punitive delay claims are unenforceable and are likely to be overridden by the courts.
Procurement Corruption – Six Practices Your Company Should Avoid to Prevent Collusion and Corruption.
Even unregulated privately held businesses need to be aware of certain soft practices that may be signs of collusion between their employees and Vendors.
Proprietary Specifications – An Illegal Tender for Hospital Equipment.
Proprietary specification are great anytime you want to have an established standard product and do not wish to deviate from that standard.
Centralized Procurement – Was the Tragedy of the Grenfell Tower Avoidable?
At Grenfell, the panels that were used were constructed with polyurethane core panels. These panels are permitted by code in the UK.
Modular Construction – Architects Responsible for Lag in Adoption of Pre-Fabricated Construction Techniques?
I want to reflect on all of the ways that builders could implement modular construction methods regardless of the design or the project management.
The Future of Construction – How Off-Site Fabrication and Modular Construction Techniques Offer Speed, Savings, and Safety.
OSM construction methods can reduce the cost of construction by 20% and accelerate construction 40 percent ahead of traditional methods.
Pre-qualified Suppliers – Eight Critical Actions for Managing Your Supplier Pool.
This isn’t a shortcut to procurement, you still need a scope of work, you still need a bid period, and you still need analysis.
Construction Pricing – The Three Critical Cost Categories in Every Construction Quote
Whenever you solicit pricing for construction services, you should always address these distinct cost categories.
Control Estimates – Six Critical Steps for Reducing Risk in a Cost Plus Contract
Prior to committing to a contract it’s necessary to requisition funds, waiting until after a contract has been signed to know the full cost can be problematic.
To GMP or not to GMP that is the question?
In a recent article about pricing models, I gave a brief overview on a pricing model known as Guaranteed Maximum Price (GMP). This pricing model is often used because of the provisions that protect Owner’s from change orders. These provisions are often misunderstood and Owner’s believe that once the price is set, it cannot be…
Should you hire an engineer directly or through an architect
In last week’s article, I asserted that Architects are uniquely qualified to coordinate the various building systems of a project. I discussed the qualifications and training that makes them better suited to this task and gave my own experience of failure when the roles were reversed. Today I want to address a growing trend I…