Best Practices – GC led Design Build – Why This is the Worst Contracting Model And You Should Never Use It.
No matter how many times I counsel against using a contractor to lead design-build projects there is always someone who rationalizes away all of the negatives.
I have written about General Contractor led Design Build (GC led DB) a number of times, but I continue to encountered Stakeholders who simply insist on this model. Quite frankly there is little that I find redeeming about this model and I remain steadfast against it.
With respect to every other contracting model, I can honestly say that I hold a neutral point of view. I see viable applications for everything from Multi-prime T&M to Stipulated Sum GMP and everything in between, but I honestly feel that GC Led DB is the most despicable form of contracting in the market.
I know how strong that statement sounds, but I’m taking the gloves off for this one.
Before I go on (and alienate all of my contractor buddy’s) let me clarify that none of what follows is meant to suggest that ALL contractors are bad, nor am I suggesting that there are No contractors capable of delivering a good project under GC-led-DB.
For clarity, I feel I must take a moment to describe how GC led Design-build works.
GC led Design build is a variation of design-build where the General Contractor takes a prime contractual relationship with the Owner. All other parties (including the Architect) are sub-contracted to the GC.
This means that the Owner hires the General Contractor and then the General Contractor hires the Architect, the Engineers, and all the trade contractors. In its worst form this model also allows the GC to subcontract the commissioning agents and maybe even buy the furniture.
This is your classic one-throat-to-choke turn-key design-build model. Yes, all of those terms mean the same thing.
So why is GC-led DB so bad?
Commentary – Modular Construction – How the Industry Continues to Mix Delivery Models with Means and Methods and How it will Never Advance Because of It.
Design for Manufacturing and Assembly is a delivery model that could, “change the industry…to build better quality housing on time and at speed.”
Industry Watch – Alliance Arrangement Models – What are They and How Do They Work
A unique method of creating a legal entity that falls short of forming a Joint-Venture (JV) yet goes further than typical construction agreements.
Best Practices – Why Your Design Build Contracts Are All Wrong!
There are only certain types of suppliers who have the training and legal obligation to look after the Owner’s best interests.
Construction Consensus Procurement Improvement Act
In June of 2015 the 114th Congress of the United States introduced a bill called Construction Consensus Procurement Improvement Act of 2015. The intention of this bill was to allow for the use of Design-Build contracts in gov’t construction. Recently the Committee on Homeland Security and Governmental Affairs issued a report on the bill making certain…